ThorTurf Top Bar
ThorTurf Logo  
  ThorTurf Black Bar
Order Your Sample Today


Installation

Equipment: Pallet jack, skid steer with tracks, forks, bucket, and harley rake

Three workers are ideal:
one driving skid steer, one cutting bags, one putting bag straps on forks of skid steer for lifting

Step 1
Unload bags of ThorTurf from truck with pallet jack.

Step 2
Empty bags of ThorTurf into arena by cutting along bottom edge with a razor knife or similar cutting tool

Step 3
Smooth ThorTurf out with skid steer and bucket. Be sure to flip bucket so you are not scooping.

Step 4
Level material with skid steer and harley rake.

Step 5
Edges may require some hand raking to smooth.

 

 
 
P.O. Box 2218 • Sandusky, OH 44871 • Phone: 1-800-326-1994 • 1-419-626-4375 • Fax: 1-419-626-9168 All Content Copyright © ThorTurf 2012
About Us   I   Benefits   I   ThorTurf Calculator   I   Installation   I   Equipment   I   The Science   I   Testimonials   I   Contact Us